2.
3.Here are our notes:
4.
Date/Time:
10/4/11 1:19-2:02 pm
Participants:
Dan: Health/Safety Engineer
Mark: Environmental Engineer
Collin: Cost Estimator
Trip: Structural Engineer
Blake: Architectural Engineer
Dan's concerns:
Everything we use is safe for the environment
Materials
Site must be safe at all times
Trip's concerns:
Has to be pleasing to the eye
Withstand tornadoes/hurricanes/earthquakes/river
Collin's concerns:
Stay within budget
Blake's concerns:
Design and construction of bridge
Mark's concerns:
Must not pollute air/water
Design Plan:
Build a bridge with a series of arches. For the boating dock, build a simple runway to drop off boats and also create another building for people to throw away waste since the boat dock will create a lot of human traffic.
Ideas:
Possibly use steel instead of concrete for costs reasons
Use concrete so it will hold up better to weather conditions, since the bridge is going to be located in the wetlands.
Boad dock: create small for fishing and other small vessells
Make public facilities for waste and other various uses
Possible public facilities:
Rest stop
Bait Shop
McDonald's/Burger King/Wendy's
Public Restrooms - city planner says no using only McDonald's restrooms
Trip and Blake are currently working on the sketches
4.
5. -I learned that charrettes are really important for making a structure
-I liked the responsibility each of us had to make sure our job wad done thouroughly
-I think it would have been more fun to get to pick what we wanted to build
-I would make better sketches before diving right into the final poster next time
No comments:
Post a Comment